As part of a major roof refurbishment programme at Units 1-6, Electra Park, Electric Avenue, Birmingham, some 700 metres of Unifold Gutter Lining System has recently been installed to valley and parapet gutters serving the building.
All six adjoining units are served by individual hipped roofs discharging to valley gutters and these are joined by tee sections into a parapet gutter installed around the entire periphery of the building.

The valley gutters are some 80mm higher than the parapet gutters and to discharge to the lower gutter the tee sections are fitted with sloping ends.

The Unifold installation has replicated the existing system with consummate ease, including all corners and tees which are provided to site as fabricated sections requiring only simple site work to install.
One particular tee and combined obtuse corner was particularly complex and included many facets and angles but the lining system proved more than adequate for this item providing a simplified and more efficient component, proving yet again that Unifold is the most versatile and reliable lining system in the marketplace.