Meridian Industrial Estate

case 4 1

Meridian Industrial Estate Ampteam approved installer Blenheim Roofing Services were approached, in the second half of 2015, to quote for re-roofing units D1 & D2, Meridian Industrial Estate, Peacehaven and also to provide a guaranteed solution to the nearly 90 metres worth of guttering. The buildings were empty but were soon to be let and…

Read More

Chailey Rehabilitation Centre

case 2017 3 2

Chailey Rehabilitation Centre Chailey Rehabilitation Centre is an NHS specialist facility that carries out almost unique work in the care and therapy of severely deformed children and young persons. The existing aluminium composite gutters had failed and the gutters were subsequently treated with a GRP coating which also failed. As a consequence, water had penetrated…

Read More

Lords Cricket Ground

case 17 2

Lords Cricket Ground An installation to the Indoor Cricket Pavilion at Lords Cricket Ground was the result of some two years of design study and consideration to correct gutter deflections and broken gutter joints in the fully welded aluminium gutters. The broken gutter joints were the result of thermal expansion and contraction and were causing…

Read More

Royal Albert Hall

royal albert hall

Royal Albert Hall Over 400 metres of the Unifold® Gutter lining system was installed on London’s iconic venue, The Royal Albert Hall, throughout the summer of 2023. The Unifold® Gutter Lining System was chosen for its versatility, unfailing ability to replicate existing systems and its long life. Survey & Design Following a survey by Ampteam…

Read More

DHL Supply Chain

case 2017 2 1

DHL Supply Chain 210 Metres of Unifold Gutters was installed at the DHL Supply Chain, Barming Depot in Aylesford. UNIFOLD® Solution Installed by Blenheim Roofing, the project was a full strip & re-sheet of an asbestos cement roof. During initial surveys it was discovered that historically, the existing asbestos gutters were prone to leaks and…

Read More

ExxonMobil

case 2017 3

ExxonMobil Ampteam Limited were asked to provide a UNIFOLD® scheme for the conversion of level gutters, serving the central roof area of the building, to falls conditions, with a brief to eliminate standing water and leaks which had plagued the building for some time. Scope & Existing Conditions Some 900 metres of valley gutters serving…

Read More